Golgohar Mining and Industrial Company

Gol Gohar Mining and Industrial Company
Last updated: june 2026
No. Project Name Description Start Date End Date Total Duration (Months) Progress Percentage
1 Construction of an Ammonium Sulfate Production Plant (Desulfurization Unit) This project is designed to produce ammonium sulfate as a byproduct from pelletizing plant exhaust gases, aimed at reducing environmental pollutants. The facility has an annual capacity of 250,000 tons and is located in Sirjan, Kerman Province. July 2022 October 2026 51 %80.54
2 Construction of Steelmaking and Hot Rolling Complex This major continuous hot rolling mill project, with a production capacity of 3 million tons and located in Sirjan, Kerman Province, will enable self‑sufficiency in manufacturing API steel sheets required for the oil and gas industries March 2020 October 2026 79 %86.07
3 Construction of the Second Block of the Goharan Combined Cycle Power Plant The project for constructing the second block of the Goharan Combined Cycle Power Plant in Sirjan consists of two 183‑MW gas units and one 180‑MW steam unit, with a total capacity of 546 MW June 2022 February 2025 32 %69.07