Construction of the Second Block of Goharan Combined Cycle Power Plant
The project for the construction of the second block of the Goharan Combined Cycle Power Plant, with a capacity of 546 MW, is located in Sirjan County, Kerman Province.
July 2022
November 2027
64
%65.41
شرکت هیچگونه فعالیتی در گروه یا کانال های تلگرامی جهت سرمایه گذاری ندارد